Construction terms: a plain-English glossary

Updated
Written by
Alexander J. Hale
Reading time
19 min
Sheet
44 of 44

This glossary defines 94 construction terms that newcomers hear in their first months on a project, in plain English, with every acronym spelled out. The terms are grouped by stage of a project, from the people and contracts through design, permits, construction paperwork, money and the building’s parts to handover, and run alphabetically inside each group. A table of the pairs newcomers most often confuse comes first.

Construction terms newcomers mix up

Each pair below sounds alike or shares initials, and the two halves mean different things on the job.

Terms How to tell them apart
RFI (request for information) and submittal An RFI asks the designers what the documents mean. A submittal shows them what the contractor plans to install.
Change order and construction change directive A change order is agreed and signed by owner, contractor and architect. A directive, signed by the owner and architect only, starts the work before the price is settled.
GC (general contractor) and CM (construction manager) A GC is usually hired after design to build for a price. A CM joins during design to advise, and under CM at risk it then builds, doing a GC’s job.
Substantial completion and final completion At substantial completion the owner can use the building and warranties usually start. Final completion comes once the punch list and paperwork are done.
CO and CO On site, usually a change order. From the building department, the certificate of occupancy.
General conditions and general conditions A contract document such as A201 from the American Institute of Architects (AIA), or the contractor’s job-site overhead. The AIA itself advises saying which one you mean.
Drawings and specifications Drawings show where things go and how big they are. Specifications say what the products are and what quality they must meet.
Allowance and contingency An allowance pays for a known item not yet chosen. A contingency pays for problems nobody can name yet.
Inspection and special inspection The city inspector checks code compliance at set stages. A special inspector, hired by the owner, watches critical structural work such as concrete and steel.
Pay-when-paid and pay-if-paid Pay-when-paid delays a sub’s money until the owner pays. Pay-if-paid can cancel it.

People and companies on a construction project

Architect. The licensed designer who leads the design team and turns the owner’s needs into drawings and specifications. The architect of record is the firm whose license and seal stand behind them, and during construction the architect’s work shifts to answering the builder’s questions and certifying payments.

Civil engineer. Handles the ground around the building. Its drawings set the finished grades, where rainwater goes, the parking and drives, and the water and sewer lines that tie into the street. What structural, civil and MEP engineers do compares the three.

Construction manager (CM). A builder or consultant hired during design to advise the owner on cost and schedule. As an adviser it holds no trade contracts. At risk, it becomes the builder.

General contractor (GC). The builder under contract with the owner to put up the building. It brings on and coordinates the subcontractors and runs the job until handover.

Geotechnical engineer. Tests the soil and rock under the site and recommends the type and depth of foundation. People on site shorten the subject to “geotech.” Buyers often order that report during site due diligence, before they close on the land.

MEP engineer. Designs the mechanical, electrical and plumbing systems, from heating and cooling to power and drainage. MEP also names the systems themselves and the trades that install them. The systems themselves are covered in MEP systems in a building.

Owner. The client who funds the project and signs the main design and construction contracts. Developers, school districts, hospital systems and public agencies are common owners. Who does what maps everyone the owner hires.

Owner’s representative. A person or firm hired to run the project for the owner, so that someone on the owner’s side reads the paperwork as closely as the contractor does. More in what an owner’s representative does.

Project engineer (PE). A junior member of the contractor’s office team who keeps RFIs, submittals and logs moving, and a common first job for construction graduates. On a design team PE usually means Professional Engineer, the state engineering license. More in what a project engineer does.

Project manager (PM). At a contractor, the person who runs the business side of the job, including budget, schedule, subcontracts, changes and billing. Owners and architects have PMs too. More in what a construction project manager does.

Structural engineer. Designs what holds the building up and keeps it standing in wind and earthquakes, from foundations and columns to the frames that resist sideways force.

Subcontractor (sub). A specialty company hired by the GC for one part of the work, such as concrete, framing or electrical. Its crews are led in the field by a foreman.

Superintendent (super). The GC’s senior person on site, who runs the daily work and sequences the trades. The PM watches the money and the super watches the field. More in what a superintendent does.

Contract and delivery method terminology

AIA contract documents. Standard contracts and forms from the American Institute of Architects (AIA), sorted into lettered series. B101 is an owner-architect agreement, A201 sets the general conditions for construction, and G-series forms record changes (G701), payments (G702) and substantial completion (G704). ConsensusDocs, written by a coalition of more than 40 industry associations, publishes a competing set.

Construction manager at risk (CM at risk, CMAR). A delivery method that brings the builder on while design is still underway, first to advise on cost and buildability and later to offer a guaranteed maximum price. Under the AIA’s A133 agreement, the builder becomes bound to supply the labor and materials once the owner accepts that price.

Delivery method. The arrangement of contracts that decides who designs, who builds, when the builder joins and who carries which risks. The main ones are compared in design-build vs design-bid-build vs CM at risk.

Design-bid-build. The architect finishes the design, contractors bid on it and the winner builds under a separate contract. Roles are clear and the price is known up front, but the builder’s ideas arrive only after the design is fixed.

Design-build. One company, or one team under a single contract, both designs and builds. The Design-Build Institute of America (DBIA) calls that single contract the fundamental difference from other methods.

Differing site conditions. Physical conditions at the site, usually underground, that differ from what the contract documents showed or from what is normal for that kind of work. Many contracts let the contractor ask for more time and money if it gives prompt written notice before disturbing them. More in differing site conditions.

General conditions. In a contract, the document that governs how owner, contractor and architect work together once construction starts, with AIA A201 the usual example. In a budget, the contractor’s cost of running the site, such as supervision, the trailer and cleanup.

Guaranteed maximum price (GMP). A price ceiling built from the estimated cost of the work plus the builder’s fee, with the builder paying any overrun. A contract that pays actual cost plus a fee, with or without a ceiling, is called cost-plus. More in what a GMP is.

Liquidated damages (LDs). A daily amount, agreed before work starts, that the contractor owes the owner for each day it misses a completion date in the contract, most often the date for substantial completion, so nobody has to prove the owner’s actual losses later. More in liquidated damages.

Lump sum. A fixed price for a defined scope, called a stipulated sum on AIA forms. The contractor keeps the savings and eats the overruns. It is compared with cost-plus and unit price in construction contract types.

Means and methods. How the contractor builds the work, from equipment and sequence to temporary supports and safety. The AIA’s general conditions leave these to the contractor, which since the 2017 edition may swap out a specified method it judges unsafe unless the architect objects.

Scope of work. The written description of what a contract or subcontract includes. A scope gap is work each party assumed someone else had priced.

Design and drawing terms

Building information modeling (BIM). Producing the design as a 3D model built from objects, each holding information such as its material, size and fire rating, so plans, sections and schedules all draw on one source. Combining the architects’ and engineers’ models allows clash detection, which finds a duct running through a beam before anyone orders either one. More in BIM, software and AI in construction.

Construction documents (CDs). The final design phase, and the full drawings and specifications it produces, which get priced, permitted and built from. Each phase is covered in design phases.

Design development (DD). The middle design phase, where the chosen layout gets a sized structure, placed equipment, picked materials and a cost check against the budget.

Detail. A large-scale drawing of one small condition, such as where a window meets the wall, showing every layer and fastener. Water and fire get stopped or let through at details.

Drawing set. Every sheet for the project, organized by discipline. Each sheet’s title block gives its number, revisions and seal, and each view is drawn to a scale, such as a quarter inch to the foot. Reading one is its own skill, covered in how to read construction drawings.

Elevation. A straight-on view of one face of the building or of one wall. The word also means a height above a reference point, so an elevation drawing is often covered in elevations.

Plan. A view looking down on the building as if it had been sliced horizontally a few feet above the floor. “The plans” often means the whole set.

Program. The owner’s list of the spaces the building has to hold, with their sizes and which ones need to sit near each other.

Schematic design (SD). The first design phase, where the program becomes a rough layout and building shape. Changes cost the least here, because only drawings change.

Section. A view of the building as if cut vertically, showing how floors, walls, roof and structure stack up.

Specifications (specs). The written half of the construction documents, naming products, quality standards and installation rules. They are bound in the project manual and filed under MasterFormat, the Construction Specifications Institute (CSI) system of 50 numbered divisions, with finishes in Division 09 and electrical in Division 26. More in construction specifications and MasterFormat.

Permit and code terms

Americans with Disabilities Act (ADA). The federal civil rights law whose 2010 Standards for Accessible Design set requirements for new and altered businesses and government facilities, from door clearances to restrooms. The building code has its own accessibility rules, and a project answers to both.

Authority having jurisdiction (AHJ). The office whose sign-off a project legally needs, most often the building department. The fire marshal and other agencies have the final word on their own pieces.

Building code. The law setting minimum safety standards for structure, fire protection, exits and more. US jurisdictions usually adopt the International Building Code (IBC), which the International Code Council (ICC) revises every three years, often with local amendments.

Building permit. The building department’s written permission to build, issued after plan review, when examiners check the drawings against the code. The permit’s place in the whole project is in how buildings get built.

Construction type. The code’s grouping by what the structure is made of and how many hours its main parts must resist fire. It runs from Type I, noncombustible with the highest ratings and typical for buildings over 75 feet tall, to Type V, which allows any material the code permits and usually means wood framing.

Fire-resistance rating. How long an assembly such as a wall or floor can hold back a standard test fire, stated in hours. Every hole punched through one has to be sealed back to that rating.

Inspection. A building department visit to check work against the approved drawings and the code at set stages, such as footings, framing and rough-in. Failed work waits for reinspection, and so does the next trade. More in building inspections and special inspections.

Occupancy classification. The code’s label for how a building, or part of one, is used, which drives much of the rest of the code. Apartment houses are Group R-2 and restaurants Group A-2, while banks and professional services, such as architects and lawyers, fall in Business Group B. More in occupancy groups and construction types.

Special inspection. Extra inspection of critical work, such as concrete, structural steel and soils, required by Chapter 17 of the IBC and hired by the owner. Frisco, Texas, for one, won’t issue a certificate of occupancy until the final special inspection report arrives.

Zoning. Local law that controls what can be built on a lot, including use, height, density and setbacks from property lines. An approved exception is a variance, and the full set of land-use approvals a site needs is its entitlements. More in zoning vs building codes.

Paperwork during construction

Architect’s supplemental instructions (ASI). The architect’s written instruction or minor change that leaves price and time alone, issued on AIA form G710. A contractor that thinks it does cost money or time must say so before doing the work.

Change order. The signed agreement that adjusts the contract’s scope, price or schedule. On AIA jobs it uses form G701, and the owner, contractor and architect all sign it.

Construction change directive (CCD). An order signed by the owner and architect to proceed with changed work before price and time are settled. The contractor must start promptly and may bill for the undisputed amounts while the rest is argued.

Critical path. The longest chain of linked tasks in the schedule, which sets the earliest possible finish. Tasks off it have float, slack they can use without moving the end date. More in construction schedules and the critical path.

Daily report. The superintendent’s record of each day on site, from weather and headcount to deliveries and inspections. It becomes the main evidence when a delay is argued months later.

Long-lead item. Equipment that takes months to arrive after ordering, such as elevators or switchgear, the large electrical gear where utility power enters the building. Its submittals go first.

OAC meeting. The regular meeting of owner, architect and contractor to work through open questions, changes and the schedule.

Potential change order (PCO). A possible change still being priced or argued, logged until it becomes a change order or drops off the list.

Request for information (RFI). A question the contractor puts to the designers in writing when the drawings disagree, leave a gap or show something that can’t be built. An answer that adds work often becomes a change order. More in RFIs, submittals and change orders.

Shop drawings. A subcontractor’s or supplier’s drawings showing exactly how it will fabricate and install its part, such as each steel connection. They go to the designers as a submittal. More in shop drawings.

Submittal. Anything the contractor sends the design team for review before installing it, such as shop drawings, product data and samples. The review stamp says whether it can proceed as sent, proceed with corrections or must come back revised.

Money and payment terms

Allowance. A set amount in the contract for an item not yet chosen, such as lobby light fixtures. The price moves by the difference once the owner picks.

Bid leveling. Lining up subcontractors’ bids for the same trade so they can be compared on the same scope, by filling gaps, removing exclusions and pricing alternates the same way. The lowest number on a bid form often isn’t the lowest real price. More in bid leveling and buyout.

Builder’s risk insurance. Property insurance on a building while it is under construction, covering losses such as fire, theft and storm damage to the work and the materials on site. More in builder’s risk insurance and construction bonds.

Buyout. The stretch after the contract price is set, when the general contractor signs subcontracts and purchase orders for each trade. Buying a trade below its line in the estimate frees money, buying above it uses up contingency, and the contract decides who keeps any savings.

Contingency. Money set aside for costs nobody can name yet. Owner and contractor usually each hold one, and the contract says who may spend which. More in contingency vs allowance.

Construction loan. A short-term loan that pays for a building while it is built, released in monthly draws as work is done and usually paid off by a permanent loan once the building is leased. Lenders generally want the owner’s equity spent first. More in how construction loans work.

Hard costs and soft costs. Hard costs pay for the physical building. Soft costs cover everything else, such as design fees, permits, insurance and financing. A full budget is worked through in hard costs vs soft costs.

Lien waiver. A document in which a contractor, sub or supplier gives up its lien rights for a payment it has received or is about to receive. A conditional waiver works only if the payment actually clears, while an unconditional one is final the moment it is signed. More in lien waivers and mechanic’s liens.

Mechanic’s lien. A legal claim on the land and building, granted by state law to contractors, subs and suppliers who haven’t been paid. An open lien can stall a sale or a refinancing, which is why owners collect lien waivers with every payment.

Pay application (pay app). The contractor’s monthly bill, showing progress on each line of the schedule of values, retainage held and the amount due, usually on AIA forms G702 and G703. The architect certifies it, and a construction lender funds it as a draw on the loan. More in pay applications and the schedule of values.

Pay-if-paid and pay-when-paid. Subcontract clauses that tie a sub’s payment to the owner paying the GC. Pay-when-paid sets the timing. Pay-if-paid makes the owner’s payment a condition, so if the owner never pays, neither does the GC. New York, California and several other states refuse to enforce pay-if-paid clauses.

Performance and payment bonds. Guarantees from a surety company. A performance bond protects the owner if the contractor fails to finish, and a payment bond protects subcontractors and suppliers if the contractor doesn’t pay them. Federal law requires both on federal construction contracts above a dollar threshold, and states have similar laws for public work.

Pro forma. A developer’s projection of what a building will cost and earn, used to decide whether it is worth building. It runs from rent through vacancy and operating costs to net operating income, then compares the return with the total cost. More in how a development pro forma works.

Retainage. A share of each payment, set in the contract, that the owner holds back from the GC and the GC holds back from each sub, as security that the work gets finished and fixed. Depending on the contract, it is paid out at substantial completion, at final completion, or partly at each. More in retainage in construction.

Schedule of values (SOV). The contractor’s breakdown of the price into line items used to measure monthly progress. Architects check it for front-loading, extra value piled onto early items so the contractor is paid ahead of the work.

Takeoff. Measuring quantities from the drawings, such as cubic yards of concrete or the number of doors, so an estimator can price them. More in how construction estimating works.

Value engineering (VE). A structured review that looks for a cheaper way to get the same function over the building’s life. The Whole Building Design Guide says it is “not a design/peer review or a cost-cutting exercise,” which hasn’t stopped the label from landing on plenty of plain budget cuts. More in what value engineering is.

Building parts and systems

Building envelope. The building’s skin, from the below-grade walls up through the exterior walls, windows and roof. Its job is to control the flow of water, air, heat and vapor between indoors and out. More in what the building envelope is.

Curtain wall. An exterior wall of glass and metal framing that hangs off the structure and carries only its own weight and the wind. It gives a glass office tower its face.

Drywall. Paper-faced gypsum panels screwed to metal or wood studs to make interior walls and ceilings. Fire-rated walls use fire-resistant board, and the number of layers is part of the rating.

Firestopping. Sealing the gaps where pipes, ducts and cables pass through fire-rated walls and floors, using tested products. Inspectors check it before the walls close, because afterward nobody can.

Flashing. Thin metal or membrane pieces at edges, joints and openings that turn water back outside. Flashing that is missing or lapped the wrong way is a classic cause of leaks.

Foundation. The structure that carries the building’s weight into the ground, through footings near the surface or deep foundations such as piles.

HVAC. Heating, ventilation and air conditioning, the equipment and ducts that heat, cool and move air, and the M in MEP.

Podium. A concrete base, often holding parking, shops and the lobby, with wood-frame floors above. Five wood floors over one concrete level is a 5-over-1. More in 5-over-1 and podium buildings.

Rough-in. The stage when pipes, wires, boxes and ducts go into open walls and ceilings, inspected before insulation and drywall cover them.

Slab. A flat layer of concrete forming a floor or roof, poured on the ground or held up by the structure. Steel bars called rebar carry the tension that concrete can’t.

Sprinkler system. A network of pipes and heat-triggered heads that release water over a fire, designed under NFPA 13, the National Fire Protection Association (NFPA) standard. The fire alarm system falls under a separate one, NFPA 72.

Finishing and handover terms

As-built drawings. The contractor’s markups showing where the finished work differs from the design, later turned into record drawings, the clean set the owner keeps.

Certificate of occupancy (CO). The building department’s document allowing people to use the building. A temporary certificate of occupancy (TCO) allows use of part of it while work continues. More in certificate of occupancy and temporary CO.

Closeout. The last stretch of a job. The punch list gets cleared, and warranties, manuals, record drawings, final lien waivers, retainage and final payment change hands. More in construction closeout and warranties.

Commissioning (Cx). Testing whether the building’s systems, especially heating, cooling, controls and life safety, work together the way the owner’s requirements say they should.

Correction period. The year after substantial completion, under the AIA’s general conditions, during which the contractor must fix defective work the owner reports. The contractor’s warranty is separate and doesn’t end with it.

Final completion. The point when everything is done, including the punch list and closeout paperwork, and final payment and the rest of the retainage come due.

Operation and maintenance (O&M) manuals. The equipment data, maintenance schedules and warranties handed to the owner’s facilities staff at the end.

Punch list. The list of small items still wrong or unfinished near the end, such as a scratched door or a missing cover plate. On AIA projects the punch list is attached to the certificate of substantial completion and cleared before final completion.

Substantial completion. The point when the building, or a defined part of it, is finished enough for the owner to use as intended. On AIA contracts it is recorded on form G704, warranties start that day unless the form says otherwise, and liquidated damages tied to that date usually stop running.