What does an architect do?
- Updated
- Written by
- Alexander J. Hale
- Reading time
- 11 min
- Sheet
- 3 of 44
An architect designs a building and turns what the owner needs into the drawings and specifications a contractor prices and builds from, bringing in the structural, mechanical, electrical and plumbing engineers whose work has to fit inside it. On most US projects the owner hires the architect, who takes the design through a series of phases, helps the owner get a price, and then visits the site during construction to check the work against the documents, answer the builder’s questions and certify its monthly payments. How the building actually gets put together, from the order of the crews’ work to site safety, belongs to the contractor.
What an architect does on a building project, phase by phase
The American Institute of Architects (AIA) publishes standard contract forms, and its main owner-architect agreement, B101, divides the architect’s basic services into five phases. The 2017 form calls the fourth procurement and the fifth the construction phase, but on most jobs you’ll hear them as bidding or negotiation and construction administration. Predesign comes first and sits outside the five.
| Phase | What the architect produces | What gets settled |
|---|---|---|
| Predesign and programming | The program and site studies, if hired for them | What the building has to hold |
| Schematic design (SD) | Study drawings of size, layout and form | Shape and main system choices |
| Design development (DD) | Drawings with structure and systems at true size | Materials, openings, major equipment |
| Construction documents (CDs) | The full drawing set and specifications | Everything needed to price and build |
| Bidding or negotiation | Bid documents, answers to bidders | Who builds it, and for how much |
| Construction administration (CA) | Site reports, submittal reviews, RFI answers, payment certificates | Whether the work matches the documents |
Predesign and programming
The program is the list of every room the building needs, its size, which rooms must sit beside which and any special equipment. Under B101 the owner supplies it in writing, and the architect’s first schematic design task is to check it against the site, budget and schedule. Having the architect write the program, or test how much building a site can hold, costs extra.
Schematic design
Schematic design gives the program a size, a shape and a layout. The architect produces study drawings and researches zoning and other local limits, while the engineers mostly describe their systems in a few written pages. Cost estimates at this stage mostly work from floor area, since little detail is drawn yet. Everything drawn after the owner approves this phase assumes the approval holds.
Design development
Design development is where the engineers’ systems get sized and drawn. Beams and columns get real depths, the mechanical, electrical and plumbing (MEP) engineers lay out the main ducts, shafts and equipment rooms, and the architect settles materials, ceiling heights and where the windows and doors go. It’s the first set in which a duct can be seen running into a beam. The owner approves this set too.
Construction documents
Construction documents are the complete instructions for the builder, with dimensioned plans, sections, details, schedules of every door and fixture, and the written specifications bound into a volume called the project manual. This is usually the longest design phase, and contractors price from the finished set. The guide to how to read construction drawings shows how one is organized.
Bidding or negotiation
The architect then helps the owner get a price. On a bid job that means sending out the documents, answering bidders’ questions in formal written changes called addenda and helping the owner compare the bids. When the owner negotiates instead, the architect helps run the builder interviews and takes part in the negotiations. The construction contract itself is signed between the owner and the general contractor.
What an architect does during construction
Construction administration (CA) runs from the award of the construction contract to the architect’s final certificate for payment. The architect visits the site to see how the work is progressing and whether it’s on course to match the documents, and reports deviations and defects to the owner. The rest is mostly paperwork, and B101 lists the core tasks:
- reviewing submittals, the shop drawings, product data and samples that show the products and layouts a trade will use
- answering requests for information (RFIs), the contractor’s formal written questions about the documents
- certifying the amount due on each monthly payment application
- rejecting work that doesn’t conform to the documents
- inspecting near the end to set the dates of substantial completion and final completion, with the punch list of remaining fixes in between
At 1200 Walnut Street, the fictional building the book follows, month 9 of construction brings RFI 187. The framing foreman has found a third-floor plumbing wall whose studs are too shallow to hold its drain pipe. Rosa Archer, the project architect, settles the fix with the MEP engineer and answers three days later with deeper studs, in a supplemental instruction that claims no change in cost. The contractor replies that the framers have already built two of those walls, and tearing them out is extra work. Rosa and Lana Landry, the owner’s development manager, sign a construction change directive so the work can start. The change ends up costing about $3,100, which goes into change order 6.
Who architects work for and with
The architect’s client is the owner, the person, company or public agency paying for the building. During construction the architect acts for the owner only as far as their agreement allows.
Most of the engineering comes from consultants the architect hires. B101 has the architect name the structural, mechanical and electrical engineers it retains under basic services. Combining their drawings with the architect’s own into one set that agrees with itself takes much of an architect’s week, from checking that a shaft fits its ducts to lining up the column grid with the floor plans.
The contractor signs its own contract with the owner, and B101 creates no contract between the architect and anyone else. Builder and architect deal with each other through the documents and the paper trail of RFIs and submittals.
What the architect is responsible for, and what it isn’t
The architect answers for the design, judged by the standard of care. B101 describes it as the skill and care that architects in the same or a similar locality would ordinarily bring under the same or similar circumstances. The test is what a competent peer would have done, so a drawing set can contain errors without the architect falling short of it.
How the building gets built is outside the architect’s control. The contract term is means and methods, short for construction means, methods, techniques, sequences and procedures, and site safety goes with it. B101 says the architect has no control over, charge of or responsibility for them. The AIA’s general conditions for construction, A201, make the contractor solely responsible for means and methods and responsible for site safety. The architect can require a fire-rated wall and specify every layer of it. The order the crews build it in and the scaffold they stand on are the contractor’s calls.
What an architect does day to day
Most of an architect’s week happens at a desk and in meetings. The US Bureau of Labor Statistics (BLS) lists the core duties as meeting clients to learn what they want, giving early cost and time estimates, preparing scaled drawings and specifications, directing the staff who draw, preparing contract documents and visiting job sites, plus marketing for the next project. Many architects work extra hours near deadlines.
In a typical firm a principal brings in work and owns the client relationships, and a project architect runs one or a few jobs, marking up the engineers’ latest sheets, settling a code question about exits and, once construction starts, answering RFIs. About 14 percent of architects are self-employed, according to BLS.
How to become a licensed architect
Every state and the District of Columbia requires a license to practice architecture, and each state board sets its own rules. The National Council of Architectural Registration Boards (NCARB) runs the experience program and the exam those boards use. The usual path has four steps.
- Earn a professional degree in architecture, often a five-year Bachelor of Architecture. BLS says about two-thirds of states require one from an accredited program, and the accreditor is the National Architectural Accrediting Board (NAAB).
- Log 3,740 hours across six practice areas in NCARB’s Architectural Experience Program (AXP), about half of them at an architecture firm under a licensed architect.
- Pass the six divisions of the Architect Registration Examination, currently ARE 5.0, which can be taken in any order.
- Apply to the state board, meet any extra requirements it sets, and keep up the continuing education most states require.
NCARB’s 2026 report puts the average time to licensure at 12.3 years for people licensed in 2025, counting the degree, the experience program and the exam. Nearly 3,500 people became architects that year, and the US total passed 123,000.
How much architects make
The median pay for architects was $99,280 in May 2025, according to BLS. The lowest-paid 10 percent earned less than $62,300, and the highest-paid 10 percent earned more than $161,420. BLS counted about 124,600 architect jobs in 2025 and projects 4 percent growth from 2025 to 2035, with about 6,900 openings a year.
How architect fees are structured
Fees are negotiated job by job, and B101 offers three options. A stipulated sum is a fixed amount, a percentage basis ties the fee to the owner’s construction budget, and the third is any other method the two sides write in. The AIA’s instructions for the form list others, including hourly billing rates and a multiple of direct personnel expense, which marks up salaries and benefits to cover overhead and profit.
| Method | How it’s calculated | Who absorbs extra hours |
|---|---|---|
| Stipulated sum | One fixed fee for a defined scope | The architect, unless the owner changes the scope |
| Percentage basis | A set percentage of the owner’s construction budget, with payments based on the latest budget | The architect, though the fee rises if the budget does |
| Hourly billing rates | A rate for each person, often with a not-to-exceed limit | The owner, up to the limit |
| Multiple of direct personnel expense | Salaries plus benefits, times an agreed factor | The owner |
B101 also has the two sides fill in what percent of the fee each phase earns. Washington State’s fee guidelines for its own agencies’ public works, which bind no other owner, split it at 18 percent for schematic design, 20 for design development, 31 for construction documents, 2 for bidding, 27 for construction administration and 2 for closeout. Their Schedule B, which covers apartment buildings, gives a basic fee of 6.70 percent of a $50 million construction budget on a design-bid-build job, and that fee pays for the structural, civil, mechanical and electrical engineers as well as the architect.
Under B101, when the owner changes a decision it already approved, the architect has to notify the owner promptly and explain why the work is extra, and the redesign becomes an additional service, paid on top of the fee once the owner authorizes it.
Architect vs engineer
The architect leads and coordinates the design, and the engineers design the structure and the systems that run through it. Both need a state license to offer their services to the public.
| Topic | Architect | Structural or MEP engineer |
|---|---|---|
| What they design | The building as a whole, from layout and exits to exterior and finishes | The frame, or the heating, cooling, power, lighting and plumbing |
| Usually hired by | The owner | The architect, as a consultant |
| Degree | Professional architecture degree, often a five-year Bachelor of Architecture | Bachelor’s in engineering from an ABET-accredited program |
| Experience | 3,740 documented AXP hours | Four years of work in most states |
| Exams | ARE 5.0, six divisions | Fundamentals of Engineering (FE), then Principles and Practice of Engineering (PE) |
| National council | NCARB | NCEES |
| Median pay, May 2025 (BLS) | $99,280 | $100,840 for civil engineers, a group that includes structural engineers |
What newcomers get wrong about architects
| What newcomers assume | How it works under the standard AIA forms |
|---|---|
| The architect is on site every day | B101 calls for visits at intervals suited to the stage of construction and says the architect isn’t required to make exhaustive or continuous inspections. The contractor’s superintendent is there all day. |
| An approved shop drawing means the architect checked everything | B101 limits the architect’s review to conformance with the information given and the design concept. Checking dimensions isn’t part of it. |
| The architect runs the construction schedule | The contractor writes and updates the schedule. The architect reports to the owner when the work strays from the contractor’s latest version. |
| Because the owner pays the architect, its rulings favor the owner | When interpreting the documents, B101 tells the architect to show partiality to neither the owner nor the contractor. |
| A license lets an architect work in any state | Each state licenses its own architects, and B101 has the architect confirm it’s licensed where the project is. NCARB’s Certificate exists to make adding other states’ licenses easier. |
Sources
- Architects, Occupational Outlook Handbook, US Bureau of Labor Statistics, accessed November 26, 2026
- Civil Engineers, Occupational Outlook Handbook, US Bureau of Labor Statistics, accessed November 26, 2026
- Defining the architect’s basic services, American Institute of Architects, accessed November 26, 2026
- Summary: B101-2017, Standard Form of Agreement Between Owner and Architect, AIA Contract Documents, accessed November 26, 2026
- Instructions: B101-2017, Standard Form of Agreement Between Owner and Architect, AIA Contract Documents, accessed November 26, 2026
- AIA Document B101-2017 sample, Internet Archive copy of the AIA’s own posting, American Institute of Architects, accessed November 26, 2026
- AIA Document A201-2017 sample, Internet Archive copy of the AIA’s own posting, American Institute of Architects, accessed November 26, 2026
- Standard of care: Confronting errors and omissions up front, American Institute of Architects, accessed November 26, 2026
- Charging for services, American Institute of Architects, accessed November 26, 2026
- Chapter 08: Architect/Engineer Fee Guidelines and Fee Schedule, Washington State Office of Financial Management, accessed November 26, 2026
- Experience Requirements, NCARB, accessed November 26, 2026
- ARE Overview: Architect Registration Examination, NCARB, accessed November 26, 2026
- How to Start ARE 5.0, NCARB, accessed November 26, 2026
- Get Licensed, NCARB, accessed November 26, 2026
- NCARB by the Numbers 2026: Pathways to Practice, NCARB, accessed November 26, 2026
- NCARB by the Numbers 2026: State of Licensure, NCARB, accessed November 26, 2026
- NCARB Certificate, NCARB, accessed November 26, 2026
- Licensure, NCEES, accessed November 26, 2026
- PE exam, NCEES, accessed November 26, 2026