How a development pro forma works
- Updated
- Written by
- Alexander J. Hale
- Reading time
- 8 min
- Sheet
- 13 of 44
A development pro forma is the spreadsheet a developer builds before buying land to test whether a new building will be worth more than it costs to create. It totals the development cost, projects the net operating income (NOI) the finished building will earn in a year once it’s full, and divides that income by the cost to get the yield on cost. If the yield beats the market cap rate by enough to pay for the risk of building, about 1 to 1.25 percentage points for new apartment projects in Baird’s 2026 outlook, the deal works on paper and goes to lenders and investors.
What a development pro forma means
Pro forma is Latin for “for form,” and in finance Merriam-Webster gives it the sense of figures based on assumptions or projections. A development pro forma is a forecast for a building that so far exists only as a massing study and a land contract.
The developer’s investment committee decides from it whether to close on the land. Equity investors judge whether their money comes back with a return, since they are repaid after the bank. The construction lender reads it because the finished building’s income repays the loan, and the Office of the Comptroller of the Currency (OCC), which supervises national banks, tells its examiners that a project whose expected value isn’t sufficiently above its cost is generally not feasible.
Every line starts as an estimate, because the pro forma comes months or years before any construction contract. Once that contract is signed, the cost side hardens into a budget the owner tracks invoice by invoice, while the income side stays a forecast until the leasing office opens.
The two halves of a pro forma
The cost side adds land, hard costs (the construction itself), soft costs (design, permits, legal work, the developer fee, loan interest and the rest) and a contingency into total development cost. The hard costs vs soft costs page breaks those lines down per apartment and per square foot. Massachusetts’ housing agency notes that this feasibility work generally starts before the site is bought or optioned, so the first version usually runs alongside the site due diligence studies. The rest of this page follows the income side, which decides what the building is worth.
The income side, step by step
Each step works from the line above it.
- Gross potential rent. Every apartment leased for all 12 months at the rent the market study supports. The OCC’s glossary calls this gross income, the revenue at full occupancy. Many pro formas use today’s rents with no growth built in, known as untrended rents, and Baird’s 2026 outlook quotes development yields on that basis.
- Vacancy and credit loss. Rent lost to empty apartments, turnover and tenants who don’t pay. What remains is effective gross income. US apartments were 94.9 percent occupied in the first quarter of 2026, according to RealPage data in the Baird report, so a 5 percent allowance sits near the national figure. That quarter RealPage also counted 25.5 percent of units offering concessions, free rent for signing a lease, worth about a month on a 12-month lease.
- Other income. Parking, storage, pet and amenity fees, plus the net rent from any shops on the ground floor.
- Operating expenses. Property taxes, insurance, payroll, common-area utilities, repairs and management. Loan payments stay out of this line. The Institute of Real Estate Management found apartments spending $7,981 a unit to operate in 2024, out of $20,575 in gross rent per unit, a ratio of roughly 39 percent. The National Apartment Association’s figures, covering over 16,000 properties that year, put operating costs, property taxes and payroll at 44 cents of each rent dollar, 45 with capital spending added. A pro forma budgeting below the low end of that range owes the lender an explanation.
- Net operating income. Effective gross income plus other income, minus operating expenses. It’s what the building earns in a year before the mortgage gets paid, and every ratio below divides it by something.
Yield on cost vs cap rate
Both ratios begin with the same NOI. Yield on cost divides it by total development cost, the price of creating the building. The capitalization rate, or cap rate, divides it by the price investors pay for finished, fully leased buildings like it, and research firms publish averages from recorded sales. Turned around, the cap rate values a building. The OCC calls this method direct capitalization and says it suits a stabilized NOI, the settled income of a building that has finished leasing up.
The gap between the two rates is the development spread. Someone who buys a finished building skips the years of design review, construction pricing, lease-up and interest-rate exposure the developer carried, so the developer expects more income per dollar than the buyer will accept. First American put the national apartment cap rate at 5.7 percent for the third quarter of 2025, unchanged for seven quarters running. Baird’s 2026 outlook says new developments were aiming for untrended yields in the low to mid 6s, roughly 100 to 125 basis points over prevailing cap rates. One basis point equals 0.01 percentage point. Taken together, Baird’s two figures imply cap rates of roughly 5 to 5.5 percent, below First American’s national average.
When the spread holds, the building is worth more than it cost on the day it fills. That gain stays on paper until the owner sells or refinances, and it moves whenever cap rates do.
Development pro forma example at 1200 Walnut Street
1200 Walnut Street, the fictional six-story building the book follows, has 200 apartments over a concrete podium with two shops at street level. Its owner, Fernwood Development, holds its buildings for rent. Fernwood’s development manager, Lana Landry, needs the income to support an $87.0 million total cost before Fernwood closes on the land. Fernwood’s hurdle is a yield on cost one full point above the cap rate she assumes, which is 5.25 percent. All Walnut Street numbers are illustrative.
| Line | How it’s figured | Amount |
|---|---|---|
| Gross potential rent | 200 apartments times $3,800 average monthly rent times 12 | $9.12 million |
| Vacancy and credit loss | 5 percent of gross potential rent | Minus $0.456 million |
| Collected apartment rent | $8.664 million | |
| Operating expenses | Collected rent times 40 percent, roughly $17,300 per unit | Minus $3.466 million |
| Apartment NOI | $5.198 million | |
| Two shops | Rent net of the shops’ own costs, an assumption | Plus $0.30 million |
| Total NOI | $5.50 million | |
| Yield on cost | NOI divided by the $87.0 million total cost | 6.32 percent |
| Fernwood’s hurdle | 5.25 percent cap rate plus 1 point | 6.25 percent |
| Value once full | NOI divided by 5.25 percent | $104.7 million |
| Value created | Value less total cost | About $17.7 million |
The 40 percent sits just above IREM’s national 39 percent. In dollars it’s more than twice IREM’s per-unit figure, because property taxes and insurance scale with the value of a building in an expensive city.
Walnut Street clears its hurdle by 0.07 of a point. Put in dollars, total cost could climb to about $88.0 million, roughly $1 million more, before the yield fell to 6.25 percent.
Which assumptions move the yield
The OCC expects lenders to stress-test a project’s absorption, interest rates and cap rates. Two of Walnut Street’s tests each change a single line.
| Change from the base case | NOI | Yield on cost | Hurdle | Result |
|---|---|---|---|---|
| None | $5.50 million | 6.32% | 6.25% | Clears |
| Average rent $3,700 instead of $3,800 | $5.36 million | 6.16% | 6.25% | Fails |
| Cap rate 5.5% instead of 5.25% | $5.50 million | 6.32% | 6.50% | Fails, and value drops to about $100.0 million |
A $100 miss on rent, under 3 percent, sinks the project. After vacancy and operating costs, each $100 of average monthly rent is worth about $137,000 of NOI a year, or about 0.16 of a point of yield. Rent is the assumption to test hardest. The contractor’s guaranteed maximum price eventually caps the largest cost line, and nothing locks in what renters will pay until they sign leases, years after the land closes.
The cap-rate row changes nothing about the building. Fernwood’s hurdle rides on the cap rate, so a quarter-point rise lifts the bar to 6.5 percent and cuts the value once full by about $4.8 million. The OCC describes rising interest rates reaching a project through floating-rate debt and through cap rates.
Running the pro forma backward
Start from the income and the return the investors require, work out the total cost that return allows, subtract every cost except the land, and what’s left is the most the developer can pay for the site, which the Massachusetts explainer calls the residual cost of land. At Walnut Street’s numbers, with every other line held, a total cost of about $88.0 million still meets the hurdle, so the land could have cost about $8.5 million instead of $7.5 million.
Designers use the same arithmetic a line at a time. Ten more apartments in Walnut Street’s massing study would add about $456,000 a year of gross potential rent, a number Fernwood can set against what the extra units would cost to design and build.
What a full pro forma adds
Behind the stabilized snapshot, a lender’s or investor’s model spreads costs month by month, projects how fast the building fills (its absorption), sizes the construction loan and the reserve that pays its interest, and works out investor returns such as internal rate of return. The construction loans page covers the loan side.
What newcomers get wrong
- Treating yield on cost and the cap rate as one number. They share a numerator. One divides by the cost to build and the other by the price to buy, and the gap between them is the developer’s pay for risk.
- Measuring a trended pro forma against untrended benchmarks. Growing the rent each year before the building opens raises the yield without changing the building. The development yields Baird reports are untrended, so a trended pro forma set beside them looks better than it is.
- Reading the vacancy line as the lease-up. The 5 percent allowance covers a full building’s normal turnover. The months while a new building fills belong on the cost side, which is why Walnut Street’s $4.0 million interest reserve is sized to carry interest through construction and about a year of lease-up.
Sources
- Pro forma, Merriam-Webster, accessed November 26, 2026
- Comptroller’s Handbook: Commercial Real Estate Lending, Version 2.0, Office of the Comptroller of the Currency, accessed November 26, 2026
- Home for Everyone: Construction Finance Explainer, Massachusetts Executive Office of Housing and Livable Communities, Mass.gov, accessed November 26, 2026
- Multifamily Outlook 2026, Baird Global Investment Banking, accessed November 26, 2026
- Multifamily Cap Rates Poised to Slip in 2026, Xander Snyder, First American, accessed November 26, 2026
- Income/Expense IQ National Summary, 2024 Operating Data, Institute of Real Estate Management, accessed November 26, 2026
- Where Does a Dollar of Rent Go?, Leah Cuffy, National Apartment Association, February 24, 2026, accessed November 26, 2026