A 5-over-1 is a mid-rise building with five stories of wood framing, usually apartments, standing on one story of concrete that typically holds parking, shops and the lobby. The concrete base is called the podium, and the form is common because the International Building Code (IBC) treats the podium and the wood above it as two separate buildings when a floor rated to resist fire for 3 hours divides them and a few other conditions are met, so the wood’s story count starts at the deck. The owner gets six stories of floor area and builds five of them in wood, which costs less per square foot than concrete or steel.
What “5-over-1 building” means
Read the name from the top down. The first number counts the stories of light wood framing and the second counts the concrete stories under them, so a five-over-one is six stories tall from the street. Justin Fox, a Bloomberg Opinion columnist who wrote a field guide to the type in 2019, also described four-over-ones, three-over-ones and five-over-twos, and he named Casa Heiwa, an affordable housing building in the Little Tokyo district of Los Angeles finished in 1996, as probably the first five-over-one.
| Name | Wood stories | Concrete podium stories | What sets it apart |
|---|---|---|---|
| 3-over-1 or 4-over-1 | 3 or 4 | 1 | The same podium idea with fewer apartment floors |
| 5-over-1 | 5 | 1 | Six stories in all, the classic version |
| 5-over-2 | 5 | 2 | A second concrete level for more parking, shops or offices, allowed without special approval since the 2015 IBC |
| Wrap, or “Texas doughnut” | Varies | None | Apartments built around the sides of a separate concrete parking garage, so it isn’t a podium building at all |
People also say podium construction or podium building for the whole family. The IBC doesn’t define either term, and the rule behind all of them is Section 510.2.
Why podium construction is so common
The code rule: IBC 510.2 and podium construction types
The rule rests on the idea that a fire-resistant concrete level can stand in for the ground under a wood building. Flames that start among parked cars or in a store must burn through a thick rated slab before they reach any lumber, and the concrete holding up the wood won’t burn. Section 510.2, titled “Horizontal building separation allowance,” turns that idea into conditions. When every one is met, the floors above and below the deck count as separate buildings for floor area, number of stories, fire walls and construction type.
- The deck between them is a horizontal assembly, a rated floor, that resists fire for at least 3 hours.
- The building below is Type I-A, the top of the code’s fire-resistance scale, with sprinklers throughout to NFPA 13, the full sprinkler standard.
- Stairs, shafts and ramps through the deck are enclosed in construction rated for at least 2 hours.
- The building above holds only business, retail, residential or storage uses, or assembly spaces with fewer than 300 occupants each. The building below may hold anything except high-hazard uses.
- The building’s height in feet is measured from the ground, and the whole structure must stay within the lower of the two buildings’ height limits.
The wood above is usually built in Type III or Type V, two of the code’s combustible types, which the page on occupancy groups and construction types compares.
The payoff is in the story count. Under Table 504.4, sprinklered apartments in the light wood-frame types top out at between three and five stories, by type, and Section 510.2 lets those stories begin at the deck. Height in feet gets no such break, so the wood portion’s height limit usually caps the whole building, as the Wood Products Council’s WoodWorks program notes. Since the 2015 IBC the podium may also be more than one story, which is where the five-over-two comes from.
What a 5-over-1 building costs compared with concrete
Cost is the other half of the reason. The International Code Council (ICC), which writes the IBC, publishes average construction values per square foot that cities use to set permit fees. Its August 2026 table puts apartments at about $242 a square foot in Type I-A, the podium’s type, against about $191 in Type III-A and about $167 in Type V-A, two types used for wood floors. That puts the wood about 21 to 31 percent below concrete. The ICC warns that the figures are national averages meant for fees, leave out land and aren’t an estimating guide, so the gap shows the direction and rough size of the saving and nothing more precise.
Weight helps too. Richard McLain, a structural engineer writing in STRUCTURE magazine, notes that wood’s light weight can shrink the foundations and lowers the forces an earthquake puts on the building, and he adds speed of construction.
The podium: parking, retail and lobby
A podium typically holds parking, shops or amenity space, and often all of them, along with the lobby and the rooms that keep the building running, such as trash, mail and electrical rooms. Its top slab does the hardest structural work in the building. The apartment walls above follow the unit plans, the columns below follow the parking stalls and drive aisles, and where the two grids don’t line up, the slab has to carry each wall’s weight sideways to a column. Engineers call that a transfer slab.
The same level gathers the building’s pipes and ducts. Drain lines from every apartment come down to the deck and turn sideways under it, holding their slope the whole way, and each one needs a sleeve set in the forms before the pour. Drilling a new hole later is slow, careful work, especially through a post-tensioned slab laced with cables under tension. A 2021 STRUCTURE article on podium design advises that openings in such a slab “should be coordinated and clearly detailed to avoid banded tendon lines,” the bundled cables that run along the column lines. The deck is where a design team’s coordination hours buy the most.
Fire separation and sprinklers in a podium building
Fire protection in a five-over-one comes in layers. The first is the 3-hour deck, which is more than the code would ask of an ordinary Type I-A floor. Table 601 rates those at 2 hours.
The second layer is sprinklers everywhere. Section 903.2.8 requires them throughout any building with a residential fire area, and Section 510.2 requires NFPA 13 in the podium. The lighter residential standard, NFPA 13R, is limited to buildings of four stories or fewer, with the highest floor no more than 30 feet above the lowest point where fire trucks can pull up, and since the 2021 IBC a podium building counts those stories from the ground. An ICC article says the change was aimed at buildings that look five or six stories tall from the street, so a five-over-one gets the full NFPA 13 system in its wood floors too.
The third layer is inside the wood floors. Walls between apartments are fire partitions and the floors between them are rated horizontal assemblies, under Section 420. Under Section 110.3.8, the seals around every pipe and cable through them can’t be covered until an inspector has seen them. At the end of the job, the 2021 International Fire Code bars anyone from moving into any portion of the building before its sprinkler system has been tested and approved, so the sprinkler test sits on the path to the certificate of occupancy.
Common criticisms of 5-over-1 buildings
They all look the same
Fox’s 2019 column ran under the title “A Field Guide to Boxy, Stumpy Apartment Buildings.” Kit McCullough, who teaches a class on these buildings at the University of Michigan, told Michigan Public in 2019 that she finds the basic design “uninspired” and called the buildings formulas, “the most efficient response to a set of constraints.” Projects that face one code limit and one kind of budget tend to arrive at one kind of box.
The defense is about what the box delivers. Liz Falletta, an architecture professor at the University of Southern California, told NPR’s Here & Now in 2025 that the country needs the housing this form produces, and that the type is “not resistant to good design.” Both sides trace the sameness to rules and budgets, and they disagree about whether it’s a fair price for the apartments. McCullough’s own suggestions for doing better include shared gathering places such as stoops, porches and shopfronts.
Noise between apartments
Light wood floors carry footsteps. The IBC’s Section 1206 sets the minimum between apartments at a rating of 50 in lab tests for both airborne sound (STC, sound transmission class) and footfall and other impact noise (IIC, impact insulation class), or 45 on the matching ratings measured in the finished building. An acoustics paper published by WoodWorks notes that the minimum is the same for entry-level housing and luxury condos, while a 1963 federal guide it cites suggested 55 for market-rate housing and 60 for luxury. The paper warns that footfall noise from above can be an issue in multistory wood buildings when the design doesn’t plan for it, and that a wood floor usually needs both a heavy topping such as gypsum concrete and a resilient ceiling below to reach STC 50. The criticism is fair at the code minimum, and anything quieter is a choice the owner pays for floor by floor.
Fire during construction
This criticism has the strongest evidence behind it. In an October 2023 report covering 2017 to 2021, the National Fire Protection Association (NFPA) put the yearly average at 4,440 fires in structures under construction, with about $370 million a year in direct damage, and found that 76 percent of those fires involved residential properties. The figures cover every kind of building under construction, with no separate count for five-over-ones. Fires that started between midnight and 6 a.m. were well under a fifth of the total but caused 51 percent of the damage.
The finished building’s protection, its sprinklers and the gypsum board over its wood, isn’t there during framing, when the building is five floors of bare lumber on a concrete base. The 2021 International Fire Code has a chapter of rules for that stretch of the job. The owner needs an approved site safety plan before the building permit is issued, a construction standpipe goes in before the building passes 40 feet wherever the finished building will need standpipes, and new construction more than 40 feet tall, or more than 50,000 square feet a story, needs a fire watch during nonworking hours, meaning trained people patrolling for fire after the crews leave.
Mass timber and Types IV-A, IV-B and IV-C
The newer alternative is mass timber, large engineered wood members such as cross-laminated timber panels and glued-laminated beams. The 2021 IBC added three construction types for it, IV-A, IV-B and IV-C, after an ICC committee on tall wood buildings spent about three and a half years on the question, a study that included five full-scale fire tests at the federal ATF Fire Research Laboratory.
| Type | Apartment stories allowed, sprinklered | Height limit | How much wood may show |
|---|---|---|---|
| IV-A | 18 | 270 feet | None, all mass timber covered with noncombustible protection |
| IV-B | 12 | 180 feet | Limited areas of ceilings and walls |
| IV-C | 8 (9 for offices) | 85 feet | Most interior wood may be exposed, with concealed spaces and shafts still protected |
Those numbers put mass timber past light wood framing’s ceiling, and past the five-over-one’s six stories, without a podium. The 2024 IBC changed how much of a Type IV-B ceiling and its beams may be left exposed, and WoodWorks listed 42 states where the state, or major jurisdictions within it, had adopted the tall mass timber provisions as of September 2026. Cost is the open question, and the studies are thin. A 2019 literature review for the City of Vancouver compared mid-rise mass timber with concrete and found differences of up to 6 percent either way, and every study it analyzed had priced a hypothetical building.
Walnut Street: a five-over-one by the numbers
1200 Walnut Street, the fictional six-story building the book follows, is a five-over-one, and its numbers (illustrative, like all of the book’s) show how the form divides the work.
| Podium | Wood floors | |
|---|---|---|
| Levels | 1 | 2 to 6 |
| Floor area | About 40,000 sq ft | About 160,000 sq ft |
| What it holds | Lobby, a small street-level garage, two retail shells, bike storage, and the trash, mail and package rooms | 200 apartments |
| Construction | Concrete, Type I-A, with a post-tensioned top slab | Wood frame, in a combustible type the code allows to that height with sprinklers |
| Occupancy groups | S-2 garage, M shops (A-2 if a restaurant leases one) | R-2 apartments |
Concrete covers about a fifth of the building’s 200,000 square feet and carries the other four-fifths. The owner, Fernwood Development, earns its return from rent over many years, and Lana Landry, who runs the project for Fernwood, picked this form with that long hold in mind. The framers work from about month 6 to month 11 of a roughly 20-month build. Once the frame reaches about the fourth floor, the general contractor puts a nightly fire watch in place, so someone is patrolling the bare wood floors after the last crew has left.
Sources
- 2021 International Building Code, Chapter 5 General Building Heights and Areas, UpCodes (Colorado adoption), accessed November 26, 2026
- 2021 International Building Code, Chapter 6 Types of Construction, UpCodes (Colorado adoption), accessed November 26, 2026
- 2021 International Building Code, Chapter 4 Special Detailed Requirements Based on Occupancy and Use, UpCodes (Colorado adoption), accessed November 26, 2026
- 2021 International Building Code, Chapter 9 Fire Protection and Life Safety Systems, UpCodes (Colorado adoption), accessed November 26, 2026
- 2021 International Building Code, Chapter 12 Interior Environment, UpCodes (Colorado adoption), accessed November 26, 2026
- 2021 International Building Code, Chapter 1 Scope and Administration, UpCodes (Colorado adoption), accessed November 26, 2026
- 2021 International Fire Code, Chapter 33 Fire Safety During Construction and Demolition, UpCodes (Colorado adoption), accessed November 26, 2026
- Code Path and Requirements for Mid-Rise Podium Projects, WoodWorks, Wood Products Council, accessed November 26, 2026
- 5-over-2 Podium Design, Terry Malone, STRUCTURE magazine, January 2017, accessed November 26, 2026
- Mid-Rise Wood-Frame Buildings, Richard McLain, STRUCTURE magazine, accessed November 26, 2026
- Multi-Unit Residential Construction Over Podiums, Matthew H. Johnson, STRUCTURE magazine, August 2021, accessed November 26, 2026
- Multi-Unit Residential Construction Over Podiums, Matthew Johnson, Connor Bruns and Eric Twomey, Simpson Gumpertz & Heger, August 2, 2021, accessed November 26, 2026
- Building Valuation Data, August 2026, International Code Council, accessed November 26, 2026
- Significant changes to NFPA 13R sprinkler protection in the 2021 International Building Code, Building Safety Journal staff, International Code Council, September 3, 2021, accessed November 26, 2026
- A Field Guide to Boxy, Stumpy Apartment Buildings, Justin Fox, Bloomberg Opinion, February 21, 2019, republished by WealthManagement.com, accessed November 26, 2026
- Why so many modern “ticky-tacky” apartments all look just the same, Stateside, Michigan Public, August 1, 2019, accessed November 26, 2026
- Why do so many new apartment buildings look the same? And is that a problem?, Peter O’Dowd and Will Walkey, Here & Now, WBUR, April 3, 2025, via WLRN, accessed November 26, 2026
- Acoustical Considerations for Mixed-Use Wood-Frame Buildings, Steve Thorburn, WoodWorks, Wood Products Council, accessed November 26, 2026
- Fires in Structures Under Construction, Richard Campbell, NFPA Research, October 2023, accessed November 26, 2026
- Tall mass timber provisions represent historic new building code requirements, Buddy Showalter, ICC Building Safety Journal, August 10, 2020, accessed November 26, 2026
- Status of Building Code Allowances for Tall Mass Timber in the IBC, WoodWorks, Wood Products Council, accessed November 26, 2026
- Literature Review of Cost Information on Mid-Rise Mass-Timber Building Projects, Rashmin Sorathiya, UBC Sustainability Initiative for the City of Vancouver, August 2019, accessed November 26, 2026